A dual multilateral completion as an alternative to un-wanted water control in horizontal wells

Musaab Ibrahim Magzoub, M. Enamul Hossain

Research output: Chapter in Book/Report/Conference proceedingConference contribution

3 Citations (Scopus)

Abstract

Worldwide water production (e.g. also called as un-wanted water) creates huge oil fields problems. An estimate shows that the average of three barrels of water is produced for each barrel of oil. The common practice in vertical wells is to block the water zone and perforate above. However, in horizontal zone if the oil-water contact (OWC) reaches the horizontal section, the well will be abandon. In literature, there are many methods used to delay water break though. Horizontal wells increase the potential of OWC movement due to the phenomena of high velocity of flow near heal compared to toe. Horizontal wells have been increased significantly for last twenty years and almost replaced the vertical wells. Moreover, horizontal drilling has become a common practice with recent technology and advanced tools. As a result, the technology starts moving towards multilateral wells and extended reach drilling. In addition, some geological and reservoir cases put horizontal well in a challenging position. But still no one can deny advantages of horizontal wells and its contribution to the oil production and increasing exploited reserves. This article addresses the most exhibited challenges faced in horizontal well completions. In addition, the paper proposes the dual multilateral drilling and completion strategy and compares the proposed method with the conventional solution by ICDs and ICVs. A case study is also presented to show the effectiveness of the proposed strategy. The problem with the existing practice is that the velocity of flow at heal is very high compared with the toe of a horizontal section. This situation causes many problems especially when there is permeability or pressure variations. It becomes even worst when the horizontal section is near the water-oil contact (OWC). The OWC below the horizontal section will be disturbed and this leads to early water break through. ICV is used to choke the heal area or some perforation design technique. All these techniques are based on reducing the production from that area. This article outlines how to tackle this issue using the proposed dual lateral completion while allowing the production to be increased within wider save margin. This method will be useful for enhancing the production and reducing the water break through for a reservoir.

Original languageEnglish
Title of host publicationSociety of Petroleum Engineers - SPE North Africa Technical Conference and Exhibition 2015, NATC 2015
PublisherSociety of Petroleum Engineers
Pages77-92
Number of pages16
ISBN (Electronic)9781510813533
DOIs
Publication statusPublished - 2015
Externally publishedYes
EventSPE North Africa Technical Conference and Exhibition 2015, NATC 2015 - Cairo, Egypt
Duration: Sept 14 2015Sept 16 2015

Publication series

NameSociety of Petroleum Engineers - SPE North Africa Technical Conference and Exhibition 2015, NATC 2015

Conference

ConferenceSPE North Africa Technical Conference and Exhibition 2015, NATC 2015
Country/TerritoryEgypt
CityCairo
Period9/14/159/16/15

Keywords

  • Dual lateral drilling
  • Heal-to-toe
  • Multilateral well
  • Well completion
  • Well trajectory

ASJC Scopus subject areas

  • Geotechnical Engineering and Engineering Geology
  • Geochemistry and Petrology
  • Fuel Technology

Fingerprint

Dive into the research topics of 'A dual multilateral completion as an alternative to un-wanted water control in horizontal wells'. Together they form a unique fingerprint.

Cite this