A model for construction delays claims assessment

Sasan Golnaraghi, Sabah Alkass

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

Disputes in the construction industry originate from delays. These delays affect project parties, the contractor and the owner. Loss of either anticipated revenue or opportunity cost and time overrun, on the owner's side, and increased overhead cost, escalation cost and liquidated damages, on the contractor's side, are the main impacts of delays. Preparing delay claims is a time and resource consuming process. Facilitating this process will benefit both project parties. This paper presents a new systematic delay analysis technique to assist in the evaluation of concurrent delays, while considering the critical path of the project. This technique allocates delays among project parties. An expert system is designed to classify different types of delays, as well as to offer recommendations on delays or delaying events. The expert system and the proposed delay analysis technique are integrated with scheduling software. Likewise, a costs computing feature enhances the capability of the system and assists the analyst to reduce the time and cost associated with delay claim preparation. This paper discusses the new delay analysis technique.

Original languageEnglish
Title of host publication56th Annual Meeting of the Association for the Advancement of Cost Engineering 2012, AACE 2012
Pages156-180
Number of pages25
Publication statusPublished - 2012
Externally publishedYes
Event56th Annual Meeting of the Association for the Advancement of Cost Engineering 2012, AACE 2012 - San Antonio, TX, United States
Duration: Jul 8 2012Jul 11 2012

Publication series

NameAACE International Transactions
Volume1
ISSN (Print)1528-7106

Conference

Conference56th Annual Meeting of the Association for the Advancement of Cost Engineering 2012, AACE 2012
Country/TerritoryUnited States
CitySan Antonio, TX
Period7/8/127/11/12

ASJC Scopus subject areas

  • Engineering(all)

Fingerprint

Dive into the research topics of 'A model for construction delays claims assessment'. Together they form a unique fingerprint.

Cite this