Corrigendum to “Interleaved step-up soft-switching DC–DC Boost converter without auxiliary switches” [Energy Rep. 8 (2022) 6499–6511, (Energy Reports (2022) 8(6499-6511) (S2352484722008320), (10.1016/j.egyr.2022.04.069))

M. Rezvanyvardom, A. Mirzaei, M. Shabani, Saad Mekhilef, Muhyaddin Rawa, Addy Wahyudie, Mahrous Ahmed

Research output: Contribution to journalComment/debatepeer-review

Abstract

The authors regret <The affiliation of “Muhyaddin Rawa” is Smart Grids Research Group, Center of Research Excellence in Renewable Energy and Power Systems, King Abdulaziz University, Jeddah 21589, Saudi Arabia >. The authors would like to apologise apologize for any inconvenience caused.

Original languageEnglish
Pages (from-to)10814
Number of pages1
JournalEnergy Reports
Volume8
DOIs
Publication statusPublished - Nov 2022

ASJC Scopus subject areas

  • General Energy

Fingerprint

Dive into the research topics of 'Corrigendum to “Interleaved step-up soft-switching DC–DC Boost converter without auxiliary switches” [Energy Rep. 8 (2022) 6499–6511, (Energy Reports (2022) 8(6499-6511) (S2352484722008320), (10.1016/j.egyr.2022.04.069))'. Together they form a unique fingerprint.

Cite this