Abstract
Femtocells (FC) have been introduced in WiMAX networks due to the high data rate broadband access provided by Wimax networks. The key features like increased cell coverage, high throughput indoors and system capacity of FC are widely being accepted. However, issues regarding macro/femto handover decision are still being considered. This paper evaluates a technique for a macro/femto handover. The analyzed procedure offers communication with the mobile station having reduced delay. Moreover, it minimizes the number of FC(s) to be scanned during cell selection on the basis of cell ratio thus saving handover decision time.
Original language | English |
---|---|
Pages (from-to) | 2157-2168 |
Number of pages | 12 |
Journal | Wireless Personal Communications |
Volume | 85 |
Issue number | 4 |
DOIs | |
Publication status | Published - Dec 1 2015 |
Externally published | Yes |
Keywords
- Femtocells
- Handover delay
- Mobile WiMax
ASJC Scopus subject areas
- Computer Science Applications
- Electrical and Electronic Engineering