Abstract
This paper discusses fundamental requirements necessary for implementing a model-based document production and management system for Construction. This system intends to capture, in concert with the contemporaneous documents, other information about context, rationale and process. This is a requisite for formulating a project's history, and reconstructs the true accounts of what happened during a period of construction. Accurate accounts of project events are essential for a successful and equitable claim resolution.
Original language | English |
---|---|
Pages | 65-74 |
Number of pages | 10 |
Publication status | Published - 1999 |
Externally published | Yes |
Event | Canadian Society for Civil Engineering - 1999 Annual Conference - Regina Saskatchewan, Canada Duration: Jun 2 1999 → Jun 5 1999 |
Conference
Conference | Canadian Society for Civil Engineering - 1999 Annual Conference |
---|---|
Country/Territory | Canada |
City | Regina Saskatchewan |
Period | 6/2/99 → 6/5/99 |
Keywords
- Delay Claims
- EDMS
- Product/Process Data-Models
- STEP, Database
- WBS