Documenting for claims: IT requirements for a model-based EDMS

Mamoon M. Hammad, Sabah T. Alkass

Research output: Contribution to conferencePaperpeer-review

Abstract

This paper discusses fundamental requirements necessary for implementing a model-based document production and management system for Construction. This system intends to capture, in concert with the contemporaneous documents, other information about context, rationale and process. This is a requisite for formulating a project's history, and reconstructs the true accounts of what happened during a period of construction. Accurate accounts of project events are essential for a successful and equitable claim resolution.

Original languageEnglish
Pages65-74
Number of pages10
Publication statusPublished - 1999
Externally publishedYes
EventCanadian Society for Civil Engineering - 1999 Annual Conference - Regina Saskatchewan, Canada
Duration: Jun 2 1999Jun 5 1999

Conference

ConferenceCanadian Society for Civil Engineering - 1999 Annual Conference
Country/TerritoryCanada
CityRegina Saskatchewan
Period6/2/996/5/99

Keywords

  • Delay Claims
  • EDMS
  • Product/Process Data-Models
  • STEP, Database
  • WBS